
Today’s demonstration also confirmed Jules Verne is able to establish a continuous two-way data link with the ISS. Using the high-rate S-band communication link, which was switched on at a distance of 40 km from the ISS, Jules Verne for the first time conducted relative GPS (Global Positioning Satellite) measurements with the Station. Relative GPS is a navigation technique executed by computers between the ATV's GPS receiver and the ISS GPS receiver that enables ATV to navigate relative to the Station with very high accuracy.
(+) Read more…
For both the flight control team in Toulouse, France and the ISS flight crew, this 64 kilobits/sec transmission rate also made it possible to test all the crucial data and communication connections between the two spacecraft, including some monitoring capability on both sides to send and receive communications.

During the demonstration the astronauts on board ISS reported they were able to see Jules Verne with the naked eye. The spacecraft could also be seen via screens inside the ATV Control Centre.
Data collected throughout the first demonstration day will now be analysed by the ESA JADOR (Jules Verne ATV Demonstration Objectives Report) team. A report will be submitted to the ISS Mission Management Team. After an assessment and authorisation on 30 March, ATV can proceed to Demonstration Day 2 on Monday (including an approach to within 11 m of the ISS). Docking with the ISS is scheduled on Thursday (3rd of April 2008), soon after the Demo Day 2 Report.
Source : ESA
(-) Reduce post. (Not working with IE6...)